Terawerk. Site development for data centers.

Power, land, permits.

Terawerk develops large data center sites in Germany to shovel-ready: grid connection, land, permits, energy, heat and fibre. We do not build. We hand over to the operator that fits the site.

Data center capacity in Germany in 2026, federal target 5 GW by 2030.
3 GW

Source: Bitkom, federal data center strategy, 18 March 2026.

Earliest date for new large grid connections around Frankfurt.
Mid 2030s

Source: Mainova, March 2026.

Cost of congestion management in the German grid in 2025.
3.1 bn EUR

Source: Bundesnetzagentur.

Federal government target for data center capacity in Germany.
Doubling by 2030

What we believe

  • The next chip generation needs gigawatts.

    Much of what is being built in Germany today is planned in the megawatt range. The next data center generation needs gigawatt-scale sites.

    Read the Insight
  • Compute needs sites in the country.

    Anyone who wants to run models in Germany needs sites in Germany.

  • The site follows the power.

    Grid connection and land decide, not proximity to Frankfurt.

    Read the Insight

Compute belongs where the power is generated. Not where the grid is full.

What we deliver

  • Grid connection

    We run the application in the transmission system operators' Reifegradverfahren (maturity procedure): technical connection concept, land security, proof of financing, flexibility offer.

    Result: a documented 380 kV connection path.

  • Land and permits

    We secure contiguous land at transmission nodes via options and run the process for a Sondergebiet Rechenzentrum (special-use zoning for data centers) together with municipality, district and state politics.

    Result: building rights.

  • Energy and heat

    We combine direct supply from wind and solar, storage at the connection point and waste heat use under the EnEfG (Energy Efficiency Act).

    Result: an energy and heat concept that operators and grid operators accept.

  • Dark Fiber

    We review the routes and the connection to the carriers' backbone nodes.

    Result: a documented, redundant fibre path to the site.

What defines us

We are not a broker and not an operator. We know the buyers because we sit in their market. We know the grid because we come from the German energy industry. And because we do not build ourselves, we can hand each site to the operator that brings it online fastest.

Comparison: broker, developer, utility, Terawerk
Broker
Developer with own balance sheet
Utility
Terawerk
Knows demand from the US marketnopartlynoYes
Does not build, no conflict of interestyes, without substanceno, own portfoliono, own grid areaYes
Depth in the German energy marketnopartlyyesYes
Develops the pre-stage (grid, land, permits, energy)nofor itselfnoYes
Several operators on one sitenononoYes
  • For municipalities and the state

    What a campus means for a municipality: jobs in construction and operation, local investment, training of skilled workers, trade tax, waste heat for the region. And what we ask of municipality and state.

    More on municipalities and the state
  • For operators and investors

    What a Terawerk site includes at handover, the stages on the way there, and why Northern Germany.

    More on operators and investors

Insights

  • Insights
    EnEfG: waste heat and water in numbers

    PUE 1.2, staged waste heat use, 100 percent renewables from 2027. And why water is not the bottleneck in practice.

    1 min read

    EnEfGWaste heatWater
  • Insights
    1 MW per rack: what it means for land

    AI rack power density is rising from 130 kW to 1 MW. Three consequences for land requirements, auxiliary areas and waste heat.

    1 min read